Decision Analysis for Order-Specific Component Procurement with Loss-Averse Utility

沈厚才,徐进,庞湛
DOI: https://doi.org/10.3321/j.issn:1007-9807.2004.06.005
2004-01-01
Abstract:This paper studied a procurement problem faced by the make_to_order manufacturer with loss_averse utility, who will purchase additional units of an order_specific component besides his advanced purchasing. Because of long leadtime, the advanced procurement was an important way to increase the possibility of on_time delivery, and it might result in a lot of dead inventory. It was a big challenge to the make_to_order company to tradeoff the dead inventory and late delivery. After a mathematical purchasing_problem model was setting up, the existence of the optimal solution was proved and the effect of loss aversion, the uncertainty of the component demand, the supply contract parameters, and the component nature etc. on the purchasing decision were studied. As a result, our research reveals that the loss_averse manufacturer's purchasing decision is different from the manufacturer's with risk_neutral utility and risk_averse utility, and it is not in line with the intuition under some circumstances.
What problem does this paper attempt to address?