Building the world's largest Chemical Looping Combustion (CLC) unit
Nils Erland L. Haugen,Zhenshan Li,Vincent Gouraud,Stephane Bertholin,Weicheng Li,Yngve Larring,Kun Luo,Andrzej Szlek,Todd A. Flach,Oyvind Langorgen,Xinglei Liu,Mahdi Yazdanpanah
DOI: https://doi.org/10.1016/j.ijggc.2023.103975
IF: 4.4
2023-01-01
International Journal of Greenhouse Gas Control
Abstract:The world's largest Chemical Looping Combustion (CLC) demonstration unit is being built close to the city of Chengdu in China. The design and construction of the unit, as well as the coming testing, is done within the CHEERS project, which is a collaborative project between Europe and China. The funding (similar to 25M<euro>) comes from several of the project partners, in addition to EU's Horizon2020 and China's Ministry of Science and Technology (MOST). TotalEnergies has been responsible for the Front-End Engineering Design (FEED) study. The investment decision from December 2021 marks the transition from the R&D studies and design phases to Engineering, Procurement, Construction (EPC) and testing phase. The EPC phase has been led by Dongfang Boiler Co.,Ltd, and the demonstration unit is located at their technology development site in Deyang City, outside Chengdu in China. It is designed for a thermal input of 2-4 MW and includes two different reactor configurations. The first configuration is optimized for conversion of pet-coke, while the second one is tuned towards conversion of lignite. The oxygen carrier (OC) that will be used for the demonstration unit (ilmenite) will be presented, together with an overview of the various OC materials that were tested at various scales (up to 150 kWth) during the first part of the project. In addition, results from testing of a cold mock-up of the unit is presented. Finally, an overview of plans for the rest of the project is given, together with some thoughts related to intercontinental collaboration in highly collaborative projects, such as CHEERS.