Correction to: Analysis on the Evolution of Rock Block Behavior During TBM Tunneling Considering the TBM–Block Interaction

Zixin Zhang,Shuaifeng Wang,Xin Huang
DOI: https://doi.org/10.1007/s00603-018-1501-6
IF: 6.518
2018-01-01
Rock Mechanics and Rock Engineering
Abstract:Equations 3, 4, 5, 11, 13, 15, 17, 18, 19, 20, 22, 23, 24, 25, 26, 27 and 31 are reported incorrectly. The correct equations are given below.
What problem does this paper attempt to address?