A flexible planning approach for integrated lot sizing and rework planning with random proportion of defective products

Pierre Kohlmann,Florian Sahling
DOI: https://doi.org/10.1080/00207543.2024.2314717
IF: 9.018
2024-02-17
International Journal of Production Research
Abstract:We consider a stochastic capacitated lot sizing problem with in-line rework. Both defective and defect-free products can be the result of an imperfect production process in real-world production systems. However, the proportion of defective items in a production lot is subject to uncertainty. For economic and environmental reasons, the possibility to rework defective products appears reasonable since these products usually have considerable value. In this paper, a nonlinear model formulation for integrated lot sizing and rework planning is proposed. We use a sample average approach to approximate the generic nonlinear model formulation. To cope with the randomness of the proportion of defective products, we apply a flexible planning approach that allows the adjustment of production and rework quantities. We conduct extensive numerical investigations to evaluate the performance of the proposed planning approach.
engineering, manufacturing, industrial,operations research & management science
What problem does this paper attempt to address?