A Robust Production Control Policy for Hedging Against Inventory Inaccuracy in a Multiple-Stage Production System With Time Delay.

Zheng Wang,Felix T. S. Chan,Ming Li
DOI: https://doi.org/10.1109/TEM.2018.2792319
IF: 8.702
2018-01-01
IEEE Transactions on Engineering Management
Abstract:Inventory inaccuracy has significant negative impact on the performance of production control. In this paper, we investigate the robust production control problem for a multiple-stage production system with inventory inaccuracy and time delay between stages. The objective of this problem is to minimize the average production cost. The problem is solved in two steps. First, an approximate optimal p...