Assessment of levelized cost of electricity for a 10-MW solar chimney power plant in Yinchuan China

Guo Penghua,Zhai Yaxin,Xu Xinhai,Li Jingyin
DOI: https://doi.org/10.1016/j.enconman.2017.09.055
IF: 10.4
2017-01-01
Energy Conversion and Management
Abstract:•An unsteady model is proposed for annual power generation prediction of SCPPs.•LCOE of a 10-MW SCPP in China is estimated through a cost benefit analysis.•Cost advantage and concessional loan under conditions in China are considered.•SCPP is proven to be economically feasible under favorable conditions in China.