The Test Scheme of Distribution-Flexible AC Transmission System

Liu Zhengfu,Ma Ming,Xu Baiyu,Huo Qunhai
DOI: https://doi.org/10.19595/j.cnki.1000-6753.tces.170048
2017-01-01
Abstract:According to the problems such as, lack of the standardized assessment methods for the various power quality control equipment, difficult construction of the complex experimental environment and other issues, and based on advanced power electronics technology and digital simulation technology, this paper proposed a test scheme of series and parallel power quality control equipment, which can realize the comprehensive test for series compensation equipment and parallel compensation equipment under medium and low voltage. Through rational allocation the location of the power grid-disturbance source-load-switch-test equipment, the scheme adopts the method of combining physical connection and equivalent test, can not only test the various electrical parameters of the power quality equipment itself, but also measure operation performance and various performance indicators of the power quality equipment running in the power system. Experimental results show that the proposed scheme is effective.
What problem does this paper attempt to address?