Novel wreck salvaging method using curved rectangular pipe basing (CRPB) method: a case study of “Yangtze River Estuary II” ancient shipwreck salvage project

Qianwei Zhuang,Guofang Fang,Dongrong Zhou,Chi Zhang,Xin Huang,Xiaodong Zhu,Weihao Yuan,Deng Li
DOI: https://doi.org/10.1016/j.undsp.2023.11.016
IF: 5.327
2024-03-01
Underground Space
Abstract:Shipwreck salvage is a risky, time-consuming, and expensive process. Although there are many sunken ships along coastlines and in the open seas, the salvage process of a sunken ship has rarely been reported. The integrated salvage of the “Yangtze River Estuary II” shipwreck used a novel method with 22 closely locked curved rectangular pipes to form a watertight base that wrapped the shipwreck inside. The basing was lifted out of the water using a powerful crane situated on an engineering ship. For the first time, the tunneling method was used in a shipwreck salvage project, significantly reducing the disturbance to the shipwreck and its stowage, thereby preserving the original state and integrity of the shipwreck to the greatest extent. In this study, the basic concepts of the salvage method and process are explained. Solutions to critical issues in the new salvage method are provided, including jacking force prediction and major considerations for the structural design of the salvage system. The design of the salvage system and salvage process of the “Yangtze River Estuary II” shipwreck are introduced. The monitored jacking force, pipe deformation, and observed water-tightness verified that the proposed method was effective and efficient. Other possible application scenarios for the proposed method are presented at the end.
engineering, civil
What problem does this paper attempt to address?