Operating Reliability Analysis of Peaking Generating Units Considering Start-Up Failures and Degradation

Yan Yuan,Yi Ding,Chuangxin Guo,Ruifei Wang,Lin Cheng,Yuanzhang Sun
DOI: https://doi.org/10.1109/smrlo.2016.37
2016-01-01
Abstract:The peaking generating units such as gas and hydro turbines have been widely for providing operating reserve during real time operation of power systems. These generating units usually require a short lead time to start, synchronize and carry load. If the unit starts up successfully, it will transit to the in-service state for generation. However, if the unit fails to start-up or meets a random failure during operation, it goes into the failure state, which may have serious impact on system reliability. In this paper, a multi-state model has been developed for peaking generating units considering their start-up failures and degradation. The conceptual modeling and corresponding reliability solutions for peaking generating units have been comprehensively analyzed.
What problem does this paper attempt to address?