Using a Branch-and-bound and a Genetic Algorithm for a Single-Machine Total Late Work Scheduling Problem.

Chin-Chia Wu,Yunqiang Yin,Wen-Hsiang Wu,Hung-Ming Chen,Shuenn-Ren Cheng
DOI: https://doi.org/10.1007/s00500-015-1590-z
IF: 3.732
2015-01-01
Soft Computing
Abstract:Scheduling with learning effects has received a lot of research attention lately. On the other hand, it is commonly seen that time restrictions are usually modeled by due dates or deadlines and the quality of schedules is estimated with reference to these parameters. One of the performance measures involving due dates is the late work criterion, which is relatively unexplored. Thus, we study a single-machine scheduling problem with a position-based learning effect. The objective is to minimize the total late work, where the late work for a job is the amount of processing of this job that is performed after its due date. We attempt to develop a branch-and-bound algorithm incorporating with some dominance rules and a lower bound for the optimal solution. For saving computational time, we also propose three heuristic-based genetic algorithms for the near-optimal solution. Finally, the computational results of proposed algorithms are also provided.
What problem does this paper attempt to address?