Dynamic hoist scheduling problem with multi-capacity reentrant machines: A mixed integer programming approach

Jianguang Feng,Ada Che,Chengbin Chu
DOI: https://doi.org/10.1016/j.cie.2015.06.004
IF: 7.18
2015-01-01
Computers & Industrial Engineering
Abstract:•We show that the solution obtained by an existing model is not necessarily optimal.•New formulation is developed to handle the multi-capacity reentrant machine.•Our model can guarantee the optimality of its obtained solution.•Computational results indicate the effectiveness of the proposed model.
What problem does this paper attempt to address?