Multi-objective Two-Stage Multiprocessor Flow Shop Scheduling – a Subgroup Particle Swarm Optimisation Approach

Rong-Hwa Huang,Chang-Lin Yang,Chun-Ting Hsu
DOI: https://doi.org/10.1080/00207721.2014.886742
IF: 2.648
2014-01-01
International Journal of Systems Science
Abstract:Flow shop production system – compared to other economically important production systems – is popular in real manufacturing environments. This study focuses on the flow shop with multiprocessor scheduling problem FSMP, and develops an improved particle swarm optimisation heuristic to solve it. Additionally, this study designs an integer programming model to perform effectiveness and robustness testing on the proposed heuristic. Experimental results demonstrate a 10% to 50% improvement in the effectiveness of the proposed heuristic in small-scale problem tests, and a 10% to 40% improvement in the robustness of the heuristic in large-scale problem tests, indicating extremely satisfactory performance.
What problem does this paper attempt to address?