Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty

lu gan,jiuping xu
DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000243
IF: 6.415
2015-01-01
Journal of Management in Engineering
Abstract:Risk control in project management has been receiving increasing attention in recent years. This paper proposes an approach based on a risk-assessment program and demonstrates how this can be extended to enhance the multimode resource-constrained project-scheduling problem (MRCPSP) to realize risk control and effective scheduling. The main contribution of this paper is to provide a means to control scheduling and material-purchasing risks by using a bilevel decision framework to identify risk and conduct a focused evaluation. Specifically, this paper establishes a hybrid uncertain multiobjective bilevel programming model and introduces an expected-value operator to deal with the hybrid uncertainty. A multiswarm differential-updating particle swarm optimization is developed to support the model calculations. Worthiness and efficiency of the proposed approach is validated using a case study. This approach can help improve scheduling strategies and ensure realistic project-planning.
What problem does this paper attempt to address?