Virtual Water Accounting for Building: Case Study for E-town, Beijing

Jing Meng,G. Q. Chen,Ling Shao,J. S. Li,H. S. Tang,T. Hayat,A. Alsaedi,F. Alsaadi
DOI: https://doi.org/10.1016/j.jclepro.2013.12.045
IF: 11.1
2014-01-01
Journal of Cleaner Production
Abstract:Virtual water as the overall water consumption of a building includes not only the on-site water use for constructing and operating, but also the off-site water used to supply the necessary manpower, material and equipment inputs required by the building. This paper advances a systematic virtual water accounting framework for building by employing a hybrid method as the combination of both process and input output analysis. Based on the raw project data in the Bill of Quantities, a detailed case study is performed for the structure engineering of six landmark buildings in E-town, Beijing, supported by the virtual water intensity database for the Chinese economy in 2007. The total virtual water of the case buildings is quantified as 1.25E+06 m(3), corresponding to an intensity of 20.83 m(3) per square meter floor area. On-site tap-water supply, material inputs and manpower inputs contribute to 43.55%, 50.05% and 6.31% of the virtual water, respectively, indicating the fact that off-site water use plays a critical role in balancing the overall water budget of a building. (C) 2013 Elsevier Ltd. All rights reserved.
What problem does this paper attempt to address?