SEISMIC ANALYSIS OF THE ZIPINGPU CONCRETE FACED ROCKFILL DAM IN WENCHUAN EARTHQUAKE

H. L. Liu,Y. M. Chen,L. W. Ren
DOI: https://doi.org/10.1142/9789814365161_0023
2011-01-01
Abstract:On May 12 2008, a great earthquake of magnitude 8.0 occurred in Wenchuan County of Sichuan Province, western China. The Zipingpu Concrete Face Rock-fill Dam (CFRD) with 156m height, which was 17km away from the epicenter, was considerably damaged by Wenchuan Earthquake. The site investigation showed that the maximum permanent settlement was about 100 cm and the horizontal displacement was about 60 cm as a result of the earthquake. It was estimated that the peak acceleration in the top the dam along the axial and vertical direction was about 2000gal, and the peak acceleration along the river was about 1600gal. It was calculated that peak acceleration of dam bedrock was more than 500gal and the seismic intensity was more than 9 degrees. The actual experience of the peak acceleration and seismic intensity of the Zipingpu CFRD in this earthquake was far ahead of the original design standards. Based on the in-situ investigation, 3D numerical model of the Zipingpu CFRD was established and the numerical simulation analysis on Wenchuan earthquake damage was carried out. The calculated results showed that the numerical analyses were consistent to the in-site investigation. The seismic performance of the Zipingpu CFRD during Wenchuan earthquake was reproduced in the numerical model. The acceleration response, permanent deformation and damage characteristics of the Zipingpu CFRD in Wenchuan earthquake were understood.
What problem does this paper attempt to address?