Optimal Well Placement for Production Optimization
Chunhong Wang,Gaoming Li,Albert C. Reynolds
DOI: https://doi.org/10.2523/111154-ms
2007-01-01
Abstract:Optimal Well Placement for Production Optimization Chunhong Wang; Chunhong Wang U. of Tulsa Search for other works by this author on: This Site Google Scholar Gaoming Li; Gaoming Li U. of Tulsa Search for other works by this author on: This Site Google Scholar A. C. Reynolds A. C. Reynolds U. of Tulsa Search for other works by this author on: This Site Google Scholar Paper presented at the Eastern Regional Meeting, Lexington, Kentucky USA, October 2007. Paper Number: SPE-111154-MS https://doi.org/10.2118/111154-MS Published: October 17 2007 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Wang, Chunhong, Li, Gaoming, and A. C. Reynolds. "Optimal Well Placement for Production Optimization." Paper presented at the Eastern Regional Meeting, Lexington, Kentucky USA, October 2007. doi: https://doi.org/10.2118/111154-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Eastern Regional Meeting Search Advanced Search Abstract In the process of reservoir development, we always wish to drill wells at optimal locations so that more hydrocarbons can be extracted at a lower cost. Because well locations in a reservoir simulator are commonly treated as discrete variables, standard implementations of gradient based optimization is difficult so the optimization for this problem is normally done with a non-gradient based method such as the genetic algorithm. Here, we present a novel idea to convert the problem of optimizing on discrete variables into an optimization problem on continuous variables for the optimal well placement. The idea is to initialize the problem by putting a well in every grid-block and then optimize NPV. As the cost of "drilling a well" detracts from the NPV, when NPV is optimized some wells will be shutin (eliminated). For two very simple cases where the problem is to determine the optimal location of a water injection well, we show this problem formulation yields good results with a single injection well remaining after the optimization process. Keywords: water management, optimization problem, reservoir simulation, enhanced recovery, waterflooding, constraint, injector, Inj, Artificial Intelligence, Upstream Oil & Gas Subjects: Improved and Enhanced Recovery, Reservoir Simulation, Information Management and Systems, Waterflooding, Artificial intelligence Copyright 2007, Society of Petroleum Engineers You can access this article if you purchase or spend a download.