The State of the Art of Risk Management Standards on Tunnels and Underground Works in China

qunfang hu,hongwei huang
DOI: https://doi.org/10.1061/9780784413609.043
2014-01-01
Abstract:Engineering risk management in China is being paid increasing attention. More than ten years ago, risk assessment was only used for very large-scale infrastructure projects and focused on the project's economic risk. After 2002, engineering risk management was recommended for China's large-scale infrastructure construction. Project accidents were happening continuously, which lead to a lot of economic loss and severe injuries. All of the accidents on big projects provoked an urgency to take measures for dealing with risks. The government recognized that project risk management (RM) could manage the engineering construction risks and published some new guidelines/standards for large scale projects. The project RM guidelines/standards are focused chiefly on large infrastructure projects (tunnels, roads, railways, bridges, and harbor works) to manage the technical risks during project feasibility study, design and construction phases. The present article addresses the state-of-the-art risk management on tunnels and underground works in China. The features and functionality of the Project PM application (as illustrated from national data on accidents and casualties from 2003 -2011) can reduce the hazards and control the economic loss significantly.
What problem does this paper attempt to address?