Automated Method for Checking Crane Paths for Heavy Lifts in Industrial Projects

Zhen Lei,Hosein Taghaddos,Jacek Olearczyk,Mohamed Al-Hussein,Ulrich Hermann
DOI: https://doi.org/10.1061/(asce)co.1943-7862.0000740
2013-01-01
Journal of Construction Engineering and Management
Abstract:AbstractAt present, industrial projects are constructed primarily using a prefabricated approach. The modules are produced in an off-site facility and transported on transport trailers to the construction site where they are lifted by mobile cranes. One of the keys to the success of modular industrial projects is efficient crane planning, which includes path checking to find whether or not a crane has a feasible path through which to lift a module over obstructions in a congested plant. However, due to the large number of lifts, the manual path-checking practice is quite tedious and prone to error. In light of this problem, this paper proposes a methodology for automatically checking the lift paths for industrial projects. The proposed methodology simplifies and represents the three-dimensional site layout using project elevations. For each elevation, the crane feasible operation range (CFOR) is calculated based on the crane’s capacity and clearances, as well as site constraints. The pick area (PA) is cal...
What problem does this paper attempt to address?