Study on delivery date and pricing decision in supply chain based on different delivery date decision-maker

周颖,陈旭
DOI: https://doi.org/10.13195/j.cd.2011.07.33.zhouy.004
2011-01-01
Abstract:Based on price and delivery time sensitive demand,in a single-manufacturer-single-retailer's two-echelon supply chain system,with the objective of maximizing the expected profit,models of both the delivery date controlled by manufacturer and controlled by retailer are built,and the optimal solutions and the maximum expected profit are obtained. By comparison,the impact of different decision-making power of the delivery date on the optimal time of delivery date and the maximum expected profit of supply chain is discussed.In order to achieve the maximization of expected profit,based on customer demand characteristics and the guaranteed service level of delivery date,the supply chain should select the manufacturer to control the supply chain delivery date.
What problem does this paper attempt to address?