O3/H2o2 Process for Both Removal of Odorous Algal-Derived Compounds and Control of Bromate Ion Formation

Tadao Mizuno,Shinya Ohara,Fumitake Nishimura,Hiroshi Tsuno
DOI: https://doi.org/10.1080/01919512.2011.548200
2011-01-01
Abstract:The limitation of ozonation and the applicability of ozone/hydrogen peroxide process with a source water for a water supply using a flow-through type contactor were discussed. The water sample was pre-treated in a lab and spiked with bromide ion in the concentration range from 39 to 515 g/L, and both 2-MIB and geosmin, odorous algal-derived compounds, from 58 to 609 ng/L under the hydrogen peroxide dose of 0 to 3.7 mg/L. When the initial concentration of Br- was around 50 g/L, the formation of BrO3- was controlled at less than 10 g/L at the ozone dose of 2 mg/L, however the concentration of 2-MIB was over 10 ng/L in some cases with its initial concentration of around 100 ng/L during ozonation. When the initial concentration of Br- exceeds 100 g/L, it seems very difficult to meet the standard for drinking water quality even with the initial 2-MIB concentration of 100 ng/L. The dose of H2O2 from 0.5 to 2.3 mg/L attained the standard for drinking water quality with the initial concentrations of Br- of approximately 50 g/L and of 2-MIB of up to 500 ng/L at the ozone dose of 2 mg/L. When the initial concentration of 2-MIB was around 100 ng/L with the initial Br- concentration of up to 200 g/L, the H2O2 dose of 1.7 mg/L also attained the standard for drinking water quality. When the initial concentration of Br- was around 500 g/L, although the higher dose of H2O2 was required for the control of BrO3- formation and the increase of the initial concentration of 2-MIB requires more H2O2 dose, the higher dose of H2O2 could attain the standard for drinking water quality of BrO3- and 2-MIB (geosmin) simultaneously.
What problem does this paper attempt to address?