Partitioning Prediction on the Risk of Water Inflow in the First Mining Area of Zhangjiamao Mine

Hou Enke,Feng Jie,Zheng Yongfei,Guo Zuoning
DOI: https://doi.org/10.1109/iswrep.2011.5893694
2011-01-01
Abstract:In the light of the surfacing cracks and the shortage of water resources problems resulted from mining of Zhangjiamao mine. According to analyses of water-filling factors for the first mining area, this paper selects the formula in the Standard on the Exploration of Hydrogeology and Engineering-Geology in the Mining Area (GB12719-91) ( Standard for short) to calculate the heights of water flowing fractured zone at coal seam No.4-2, 5-2 respectively, and draws up two roof-breaking safety division maps. On the basis of the goaf water and the surface gully water, a scientific risk evaluation system for the roof water-bursting condition during mining coal seam No. 4-2, 5-2 is established, and a division scheme for the condition is also put forward in the paper, which provides basis for carrying out “The twelfth five-year plan” of the mine.
What problem does this paper attempt to address?