Notice of Retraction Experimental Study on Intercepting Rainfall Runoff with a Permeable Dam

Yuan Xing-cheng,Qian Xin
DOI: https://doi.org/10.1109/icbbe.2011.5780975
2011-01-01
Abstract:Notice of Retraction After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE's Publication Principles. We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper. The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org. The permeable dam is constructed by gravel or other material in river or channel to intercept rainfall runoff and storage runoff before dam. The objective of this paper is to probe interception effect of the permeable dam for surface runoff under different flow velocity by constructing different material dam in laboratory. Results obtained through different materials permeable dam indicated that the lower flow velocity through the permeable dam, the better effect of interception non-point pollution, and interception efficiency of limestone-conglomerate was great comprehensively. Even under higher flow velocity, the interception rates to SS (suspended solid) were over 30%. The interception rates to nitrogen and phosphorus were about 3%~12% and 8%~24% respectively. So when a heavy rainfall event happens, the permeable dam can be used to intercept and further purify surface runoff from farming. The permeable dam is appropriate to control non-point in the plain river network on account of its infrastructure investment and running costs far less than artificial wetland and operating simply.
What problem does this paper attempt to address?