Back-analysis of m value of multi-braced slurry wall in staged excavation

Wang Qiang,Liu Songyu,Tong Liyuan,Li Renmin,Fang Lei
DOI: https://doi.org/10.3969/j.issn.1001-0505.2011.02.027
2011-01-01
Abstract:In order to accurately determine the m value, a reasonable calculation model must be chosen. Combining with support for dynamic multi-braced excavation process, the constrained nonlinear design model is established based on the elastic foundation beam method. Taking the minimum of relative residual sum of squares of measured and calculated displacement as the goal, the objective function of parameters of the back-analysis is established according to the measured data, and then the objective function is optimized by Matlab-constrained nonlinear optimization techniques. A multi-layer dynamic construction back-analysis method is established to enable m value to reflect soil properties. The practical engineering applications of deep pit of Suzhou subway shows that the displacement back-analysis method is simple and easy and m value obtained can well reflect the actual situation. Meanwhile, it can accurately predict the displacement of next working conditions.
What problem does this paper attempt to address?