Analysis on the Local Scour Around Complex Piers of a Sea-Crossing Bridge

梁森栋,张永良
DOI: https://doi.org/10.13243/j.cnki.slxb.2011.11.012
2011-01-01
Abstract:The most common cause of bridge failures is scour around piers. In order to ensure the safety of the bridge,it is necessary to evaluate the scour depth accurately and take countermeasures at an early stage. In this paper the HEC-18 method is applied to evaluate the scour depth adjacent to the foundations of a sea-crossing bridge,and the results show that the deepest local scouring occurs at the main pier of the main bridge section and the scour caused by pile group of the foundation is the major part of the total scour. The total scour depth is not sensitive to the draft of the pile cap. Further discussion shows that the relationship between the scour depth of complex piers and the current attack angle is much more complicated than that for a solid pier,and proper method must be applied to deal with the problems.
What problem does this paper attempt to address?