Risk assessment for power system static security based on fuzzy modeling of weather conditions

Xi Chen,Yaowu Wu,Suhua Lou
DOI: https://doi.org/10.1109/PEAM.2011.6134876
2011-01-01
Abstract:The fuzziness of weather conditions and boundaries between neighboring climatic regions exerts a great influence on the modeling of failure rates of overhead lines. This paper introduces the failure rate multiplier (FRM) to reckon in the weather impact and establishes a fuzzy inference system with load of wind (LW) and load of icing (LI) as the input logic variables. On this basis, the FRM and thus the time-varying failure rate are obtained through the Mamdani's min-max-centroid method. Then, the time-varying restoration time and failure rate are used to simulate the situation in which a line traverses several climatic regions considering fuzzy boundaries. Finally, the weather-related failure rate and restoration time are applied to risk assessment for power system static security. Simulation results on the New England 39-bus test system demonstrate the necessity of incorporating weather factors into risk assessment, and prove the feasibility and effectiveness of the proposed method.
What problem does this paper attempt to address?