Effect of Rainfall Characteristics on Pollutant Removal by Road Initial Runoff Settlement

左晓俊,傅大放,李贺
2010-01-01
Abstract:By using the free settlement tests of rainfall runoff sampled from a representative of expressway pavement in Nanjing, removal rates of pollutants were evaluated during runoff settling. The influences of rainfall characteristics, seasonal changes, initial SS concentration, temperature and pH on the removal rates by settling were analyzed. Thirty rainfall events were monitored from February 2008 to March 2009.The results showed that SS removal by settlement was the most obvious after 2 hour free settlement. The average removal rate of SS was 33.26%. The average removal rates of other pollutants were about 20%. By cluster analysis, it could be seen that the effect of the rainfall and average rainfall intensity on SS and COD settlement was the greatest. In seasons of summer and winter, the average SS removal rates were 42.13% and 20.76%, respectively. But the removal rates of COD and heavy metals had no obvious variation with season change. There was a better correlation between the initial concentration of SS and the SS removal rate, the correlation coefficient reached 0.6864.The significant level of temperature and SS, Pb removal rates were at 0.01 and 0.05, respectively. Zn, as mostly dissolved, was greatly affected by pH.
What problem does this paper attempt to address?