Method of Determining Duration of Stage Constructed Surcharge Preloading with a View to Second Settlement

HU Ya-yuan
DOI: https://doi.org/10.3785/j.issn.1008-973x.2010.05.021
2010-01-01
Abstract:A one-dimensional elastic visco-plastic equivalent time model was used to describe both the primary consolidation and the secondary consolidation. The formula of consolidation degree recommended by the ground improvement specification was utilized. The relationships between the duration of stage constructed surcharge preloading and the consolidation degree and the surcharge preloading were established. Then the unloading time for a specific surcharge loading can be determined. The theoretical results show that the surcharge preloading duration not only relates to the consolidation degree,the surcharge pressure ratio and the constructed plan,but also relates to the original effective stress and the visco-plastic index. Examples show that the shortest duration of stage constructed surcharge preloading exists for a specific constructed plan because the surcharge loading is restricted by the increase of soft clay's strength. Since the soft clay has obvious creep,the preloading duration determined by the pure primary consolidation is too short to satisfy the post-construction settlement and the consolidation degree determined by the effective stress area ratio is sometimes bigger than 1.0,which is obvious wrong. A suitable surcharge preloading duration must be determined by both the primary consolidation deformation and the secondary consolidation deformation.
What problem does this paper attempt to address?