Simulation and Optimization of Printing and Dyeing Production Process

ZHOU Xiao-hui,CHUN Chun,XIE Zuo-hao
DOI: https://doi.org/10.3785/j.issn.1008-973x.2010.07.026
2010-01-01
Abstract:The switching costs between equipments,the load balance of equipments and the bottleneck of equipments exist in the printing and dyeing production process.The bottleneck equipments were analyzed to optimize the utilization of bottleneck equipments and improve the utilizing performance,and the order-driven production process was researched.A model for the process was conducted with the hierarchical timed colored Petri net(HTCPN),and the model was transformed into the Witness simulation model.After analyzing the running state and results of the simulation model,the model was optimized and the bottleneck equipments were found.Simulation results verified the workableness and effectiveness of HTCPN model,which provided a theoretic principle for enterprises to make the workshop production schedule,promoted the running performance of equipments and shortened the production period.
What problem does this paper attempt to address?