Reliability Analysis of Nuclear Power Plant Bus Systems Arrangement Based on GO Methodology

李哲,鲁宗相,刘井泉
2010-01-01
Abstract:In this paper the GO method is used for analyzing the reliability of NPP bus system arrangement.Focusing on the typical one and a half breakers bus system,the detailed GO chart of typical work/failure(maintenance) two or three-state-component system is given,and the qualitative and quantitative analysis is conducted.Compared with the FTA results,the correctness and advantage of the GO methodology is verified.
What problem does this paper attempt to address?