Participation Mode of Large-Scale Jiuquan Wind Power Farm in Gansu Province to Electricity Market and Its Utilization Scheme

XU Wei,YANG Yu-lin,LI Zheng-guang,HU Dian-gang,XIA Tian,KANG Chong-qing
DOI: https://doi.org/10.13335/j.1000-3673.pst.2010.06.037
2010-01-01
Abstract:The development of clean energy, such as wind power, solar energy and so on, is the strategic choice of China to cope with energy challenges. Jiuquan region located in Gansu province is the first wind energy base with wind power capacity higher than 10 GW in China. Rapid development of wind power makes significant changes in energy mix, network topology and power balance of Gansu province in future, and there is not any precedent and successful experience in the world for reference. To solve the problem of utilizing huge wind power effectively, taking Jiuquan wind power base for instance and on the basis of analyzing the experiences of participating wind farms in the market operation abroad, the principal problems to be faced with during the utilization of Jiuquan wind power are analyzed in detail, and a new idea of low-carbon energy utilization mechanism, the wind power utilization scheme of Gansu province and its bundled outward transmission mode are proposed; and then based on analysis of foreign operational experience in the participation of wind farm in electricity market, the feasible modes of wind farm participating in market competition in different stages as well as the design of ancillary service market are discussed.
What problem does this paper attempt to address?