Application of Pre-Splitting Blast to Tunnel Construction

张东明,何洪甫
DOI: https://doi.org/10.13577/j.jnd.2010.0211
2010-01-01
Abstract:To reduce the blasting damage of the Nanshanxia tunnel excavation to the surrounding rock and the impact on upper structure,we used the shallow hole blasting and the pre-split blasting techniques,calculated the horizontal charging density,the blasthole number,blasthole spacing,unit consumption of explosive,charge weight and other parameters,took the measures of blasting vibration and ground motion intensity control,interval charging,reverse initiation and millisecond blasting.The particle vibration velocity did not exceed the control standards.After the implementation of the burst,the tunnel excavation profile is tidy and has less disturbance to the surrounding rock.These measures ensure the construction safety and project quality,reduce the amount of ultra-digging and lining as well as the cost.