Method for tuberail train rescheduling system

Wang Li,Limin Jia,Yong Qin,Jie Xu,Xuelei Meng
DOI: https://doi.org/10.1109/ICCASM.2010.5623142
2010-01-01
Abstract:This paper presents a new kind of transportation system-tuberail and analyzes its specialties, then we take the delay freight rate as objective and put forward a chance-constrained programming model to solving the train reschedule problem. Finally, the tuberail system is performed to show the application of the method.
What problem does this paper attempt to address?