Aeroengine Shop Visit Cost Prediction

FU Xu-yun,WANG Rui,ZHONG Shi-sheng
DOI: https://doi.org/10.13196/j.cims.2010.10.292.fuxy.008
2010-01-01
Computer Integrated Manufacturing Systems
Abstract:To improve prediction accuracy of aeroengine shop visit cost,the shop visit cost under contract of man hour and material was analyzed and redivided into the determinacy cost of typeⅠ,the determinacy cost of typeⅡ,the indeterminacy cost of typeⅠand the indeterminacy cost of typeⅡ.Scrap probability model of important part and the cost probability model of other material and repair were established for the indeterminacy cost of typeⅠand typeⅡ,and then particle swarm optimization was adopted to obtain models'parameters.Finally,the presented method was verified by using the actual data from some airline and a prototype system was developed.A large airline had a trial of the prototype system.The trial results showed that the prototype system could satisfy the airline's requirements.
What problem does this paper attempt to address?