Flexible Resource-Constrained Resource Leveling Project Scheduling Problem

喻小光,战德臣,聂兰顺,初佃辉,徐晓飞
DOI: https://doi.org/10.13196/j.cims.2010.09.177.yuxg.028
2010-01-01
Computer Integrated Manufacturing Systems
Abstract:To resolve highly-effective utilization of flexible resources for One-of-a-Kind Production(OKP) enterprises,a flexible resource-constrainted resource leveling project scheduling problem was proposed. Flexible resource model based on two levels mapping network was designed to represent relationships among tasks,capability and resources. Consequently its mathematical model was constructed. To resolve the model,a Path Relinking (PR) algorithm which was based on an Adaptive Serial Schedule Generation Scheme(ASSGS) and a Maximum network flow-based Flexible Resource Assignment Model (MFRAM) was presented. ASSGS adopted Serial Schedule Generation Scheme (SSGS) aiming to generate a schedule which was more beneficial to resource leveling. MFRAM was used to represent relationship among tasks,capability and resources. It effectively resolved the flexible resource assignment problem. Comprehensive computational experiments were performed on adapted standard project sets in PSPLIB. Experimental results revealed the high solution quality and better time performance of the method.
What problem does this paper attempt to address?