Research on Time Resource Configuration Verification Based on Model for IMA Systems
Ming-ming WANG,Jun HU,Wei-jun ZHANG,Wan-qian LI
DOI: https://doi.org/10.3969/j.issn.1673-629X.2018.05.008
2018-01-01
Abstract:Integrated modular avionics system (IMA) is widely used in the field of the airborne avionics system and has become the im-portant system architecture and development trend in the avionics systems.IMA are characterized by high safety,resource sharing and the highly modular integrated,where the modules or components are connected by AFDX network.In the development of IMA system,in or-der to ensure the reliability and safety of the system,IMA resources allocation must be correct,safe and effective.Therefore,it is an im-portant research content in avionics field to carry out effective system resource allocation and guarantee the correctness and safety of the configuration.Combining the feature of IMA system,we propose a model-based time resources configuration validation method for IMA system.The MARTE model of IMA system time behavior is set up,and MAST,a schedulable analysis tool,is used to analyze the schedu-lability of system time resources and simulate and verify the satisfaction between IMA configuration and requirements.Finally,a case of WaterAndWaste system is given to illustrate the validity of the method.