A Probabilistic Risk Assessment Method for Cascading Failure of Power System

SONG Yi,WANG Cheng-shan
DOI: https://doi.org/10.3321/j.issn:0258-8013.2009.04.005
2009-01-01
Abstract:The article discussed frame structure of risk assessment for cascading failure, namely decision of component outage model, choice of initial system state, analysis of continual fault process, and risk computation. Besides protection maloperation model, this paper thought over other dependent outage models such as stuck breaker, component-group outage, station-originated outage and common cause outage; the article chose initial system state of cascading failure by using of function group decomposition technique and event tree analysis, provided simplification principle and processing method of continual fault process analysis, then proposed one new probabilistic risk assessment method for cascading failure. Through the example, the article provided risk index of component outage models and risk ranking of system components. The simulation demonstrated that, the total risk value of cascading failure grows along with load factor growth. When load factor is smaller than 1, the total risk of cascading failure is mainly undertaken by protection maloperation model; when load factor achieved critical points of 1 and 1.262, the total risk value has two times of sudden changes. The first critical point is affected by common cause outage, the second critical point is affected by single component forced outage.
What problem does this paper attempt to address?