State-of-the-art of Studies on Generation Capacity Adequacy in Electricity Market Environment: Part Three Key Market Design Factors and Principles

Gang LU,Fushuan WEN,Yusheng XUE,C CHUNG,K WONG
DOI: https://doi.org/10.3321/j.issn:1000-1026.2009.05.003
2009-01-01
Abstract:How to design a workable method for ensuring generation capacity adequacy is a very important and complicated problem with many related issues. The problem is analyzed from a broad prospective. On one hand, some related important elements beyond the power sector are discussed, including the relevant policies and the role of the government. On the other hand, with regard to the electricity market design, the entities responsible for the issue, the design philosophy and the factors concerned in the design process are identified. Then, based on comprehensive comparisons among the existing methods, the features required for a workable method for ensuring adequate generation capacity are clarified. This work is jointly supported by Special Fund of the National Basic Research Program of China (No.2004CB217905) and National Natural Science Foundation of China (No.70673023).
What problem does this paper attempt to address?