Adaptive Assessment on Water Resource Carrying Capacity During Implementation of Urban Plan

赵楠,刘毅,陈吉宁
DOI: https://doi.org/10.3321/j.issn:1000-6923.2008.10.016
2008-01-01
Abstract:It is needed to estimate water resourse supply and demand in the target year in urban planning. However, the conventional technique extrapolates historic data under hyposized senarios that uncertainties will lead to unreliable planning schemes. Also various uncertainties during the implematation can influence the characteristics of risk for water resource carrying capacity in the target year. The proposed assessment method is based on the adaptive management theory. Depending on different time length historic data series obtained during plan implementation, time series analysis, curve regression, combination forecasting and Monte-Carlo sampling were used to estimate the variation of risks for future water resource carrying capacity. The results could be basis of decision-making. The case study on Beijing municipality showed that there were considerable differences in the forecasting results of water resource shortage (demand minuses supply) in 2020, by using two time series data (pre-2002 and pre-2006, respectively). The mathematic expectation increased from -0.98 billion m3 to -0.34 billion m3. The standard deviation drops from 2.32 billion m3 to 1.12 billion m3. The risk secure level (probability of demand within supply capacity) decreased from 70.5% to 58.6%. For achieving the 95% secure level, there is the shortage of 0.94 billion m3 and 1.16 billion m3 in water supply capacity.
What problem does this paper attempt to address?