Optimization of Multi-Part Inventory Control and Production Lot under Fuzzy Uncertainty

FU Yu-ying,PAN Xiao-hong
DOI: https://doi.org/10.3785/j.issn.1008-973x.2008.06.029
2008-01-01
Abstract:It is difficult for node enterprises to coordinate material inventory provision with production planning because of much uncertainty in the supply chain. Reorder of some parts and lot size with fuzzy lead time for a assembly production was considered.The effects of lead time,reorder and production lots were analyzed for reduction of the supply chain cost,and an multi-objective inventory model with fuzzy parameters was derived.Fuzzy theory was briefly introduced and an interactive fuzzy multi-objective decision-making method was proposed for solving the model to give a Pareto optimal solution.The optimal lot size and reorder of some parts were obtained to meet the market demands.A demonstration indicates that the fuzzy method is applicable to treat the material control and production coordination in the reality under uncertainty.
What problem does this paper attempt to address?