Dyeing Machine Scheduling Problem in Dyeing & Finishing Workshop

JIN Feng,SONG Shi-ji,YANG Jian-hua,WU Cheng
DOI: https://doi.org/10.13196/j.cims.2008.03.129.jinf.016
2008-01-01
Abstract:Based on actual requirements of the dyeing and finishing workshop in the cloth-making factory,the scheduling model for dyeing machine was constructed.Being different from traditional scheduling models,the proposed model considered not only the merge of small jobs but also the decomposition of large jobs.Aims of the proposed model were to minimize the total tardiness and maximize the average utilization of dyeing machines simultaneously.An existing heuristic algorithm was improved and a new heuristic algorithm was proposed to solve the dyeing scheduling problem.All the proposed algorithms were applied in real-life data from the dyeing and finishing workshop in a typical cloth-making factory in Beijing.Results showed that the proposed algorithm could not only minimize the total tardiness but also enhance the utilization of dyeing machines.
What problem does this paper attempt to address?