Research on fuzzy TOPSIS approach of project risk evaluation

Zixue Guo,Qiang Zhang
DOI: https://doi.org/10.1109/SOLI.2008.4682830
2008-01-01
Abstract:This paper analyzed the factors for venture investment project and constructed an index system for project risk evaluation based on some related literature, then given the method of determining the evaluation indexes weights using triangle fuzzy number, and put forth a comprehensive evaluation model based on fuzzy TOPSIS. Finally, this paper certificated the validity of the evaluating method via real example analysis.