A Multi-objective Power Transmission Network Planning Method Considering Spare Capacity of Transmission Lines

屈刚,程浩忠,欧阳武
DOI: https://doi.org/10.3321/j.issn:1000-1026.2008.10.006
2008-01-01
Abstract:In the conventional transmission network planning, the loading levels of different transmission lines are not considered. This may cause some transmission lines with unexpected high level loading. To solve the problem, a novel planning model is presented to minimize costs while maximize spare capacity. Given the stochastic and ergodic characteristics of fuzzy variables, a chaos optimization algorithm is introduced to solve the planning problem. Two system studies verify the proposed method.
What problem does this paper attempt to address?