Solving large-scale FSP with NEH algorithm based on block properties

Jin Feng,Song Shiji,Wu Cheng
DOI: https://doi.org/10.1109/WCICA.2006.1714508
2006-01-01
Abstract:To the problem that it is inefficient for current available heuristics solving large-scale flow shop scheduling problems (FSP), an idea of introducing properties of scheduling problem into algorithms was addressed, based on which a new NEH algorithm was proposed. In this paper, block properties of FSP were firstly analyzed and then introduced into NEH algorithm. With block properties, a low bound of partial schedule could be found in O(1), and then a branch and bound method was used to ignore most partial schedules. Numerical experiments show that the proposed algorithm can find near-optimal solutions for the large scale FSP in a short time. © 2006 IEEE.
What problem does this paper attempt to address?