Crew scheduling for Shanghai Urban rail transit from modeling to implementation

Li Xianzhong,Xu Ruihua
2006-01-01
Abstract:This paper explores the problem of crew scheduling for the Shanghai Urban Rail Transit (SUR), which now consists of mainly five routes on an operational network. The routes, capacities, and territorial coverage are ever increasing and the pressure of SUR to fill the needs of this transportation network is extremely important. SUR must develop timely constructions of crew schedules whenever passenger demand variations necessitate modifications in train timetables, typically every 2-3 months. Computer-assisted manual solutions can take up to a lot of painstaking work. Our project aims at automating this complex schedule construction, adopting a novel optimization modeling approach amenable for solution by Simulated Evolution algorithms. The entire crew schedule can be constructed iteratively in less than half of a minute on a PC. The implementation runs as a decision support tool, with contributions of an overwhelming reduction in human effort in crew schedule construction. The schedule is generally a feasible and better (higher productivity rate) schedule after some further manual adjustments.
What problem does this paper attempt to address?