China Northeast Power Network Short-term Load Forecasting Based on Neural Network

Xi-ren ZHAO,Xiu-yan PENG,Guang-yu JIANG
DOI: https://doi.org/10.3969/j.issn.1004-731X.2006.06.067
2006-01-01
Abstract:The search status of power network short-term load forecasting was introduced first, and the feasibility and problem that neural network was used in power network short-term load forecasting were introduced. The algorithms were discussed detailedly, which used BP neural network and improved BP neural network with conjugate gradient algorithm forecast power network short-term load. And the preprocessing method of power network history data was given. Then the simulation results of two kinds of forecasting method were given for 72 hours power network load of northeast of China. According to the forecasting simulation results, the conclusions are given that BP neural network training time is longer and forecasting precision is lower, but the improved BP neural network algorithm with Conjugate gradient algorithm makes the training times shorter, and it enhances forecasting precision. The calculation results show that the approaches of the improved BP neural network with conjugate gradient algorithm is feasible and can be used to forecast on line.
What problem does this paper attempt to address?