Blasting vibration analysis of concrete lining tunnel

YANG Sheng-quan,Jian Zhou,LIU Bao-chen
2005-01-01
Abstract:Based on monitoring of blasting vibration safety of the 2nd term engineering for a tunnel in Shengzhen city, which is a newly excavated tunnel close to the existing one on the condition of small clear spacing. Blasting vibration analysis of concrete lining tunnel is described by analyzing the peak particle velocity (PPV) and its main frequency. First, it is mentioned how to settle monitoring line and position according the principles, which are the principles of the position and direction of the maximum PPV, the principle of monitoring of blasting seismic effects, and the principle of the blasting vibration waves decay. Then, the information and results of monitoring are given, in which results of blasting vibration velocity monitoring of different blasting methods are emphasized, and the attenuation formula of the PPV and explosives with distance between blasting center and monitoring position are obtained, and that the V-ρ relationship of blasting vibration is pointed out too. The results show that the maximum PPV appeared in radial direction and the position of the minimum distance between blasting center and monitoring position, and appeared in the center point of wall and the apex of arch in same section, and the main frequency is focused on 15-75 Hz which differs from various concrete linings, mainly 22-50 Hz. Finally, it is pointed out by analysis and discussion of the PPV and its main frequency of three kinds of blasting methods, which are semi-face blasting and bench stopping blasting and full-face blasting, that the PPV and its main frequency have close relation with explosive mode and distance between blasting center and monitoring position, and that degree of blasting seismic effects is affected mainly by distance and degree of blasting, and that full-face blasting is the best blasting method to control the blasting seismic effects.
What problem does this paper attempt to address?