Systematic forecast method of production decline for gas wells

LaiXi Sun,Liehui Zhang,Yu Yang,Yongjun Li
2004-01-01
Abstract:The precondition of the production decline analysis method is the production must be correlated with time, i. e. the production change must be continuous and correlative with time. Using the basic principle and method of R/S analysis to calculate the Hurst index of gas producing wells, the trend of persistence of the production change is judged. Then, regard the production change as a gray system, the production change is predicted with the gray model that can represent the gray characteristics of the system. The GM( I,1) gray model is used to match and predict the production of gas wells. The calculation of Hurst index is conducted for more than 10 production decline wells in Luodai gas field respectively. Their calculated values are all more than 0. 5, which shows the production change of the gas wells has the obvious trend of persistence. Based on the basic principle of GM(1,1) model, the forecast software is made to calculate and predict the production of the gas wells. Their errors are all in the range of the accuracy requirements. The practical calculation proves the model is reliable, practical and feasible.
What problem does this paper attempt to address?