Case based reasoning system for water supply dispatching

ChunGuang Chang,Dingwei -Wang,Kunyuan Hu,Binglin Zheng,Huiying Li
2004-01-01
Abstract:In the dynamic scheduling system based on CBR of iron and steel production, to improve the validity of case adaptation, varied adaptation types are induced and analyzed, and the adaptation type based on model is emphasized on. The model function, establishing, linear converting and two-stage resolving algorithm is discussed in detail. The simulation result shows that when the CBR system combined with adaptation model is adopted to resolving iron and steel dynamic scheduling problem, it can take advantage of both the CBR system ability of dealing with non-structure problem and the model ability of dealing with quantity problem.
What problem does this paper attempt to address?