Job-shop scheduling strategy in reconfigurable manufacturing systems

Yong Chen.,Xianzhong Dai
2004-01-01
Abstract:This paper presents a practical hierarchical strategy to reconfigure the layout of an reconfigurable manufacturing system (RMS) incorporated with multiple automated guided vehicles (AGVs), and to obtain a feasible schedule with minimum total tardiness and maximum machines utilizations. The strategy includes three stages in sequence. At first stage, an augmented Lagrangian relaxation method is developed to obtain a preparatory job-shop scheduling. The method can decompose the scheduling problem subject to complex constraints into multiple subproblems at operation-level for the selection of operation beginning times and machine types. Then the layout is reconfigured to fabricate virtual manufacturing cells with the goal to minimize material handling cost of AGVs. Finally the static schedule in each virtual manufacturing cell is generated with discrete dynamic programming. Numerical study demonstrates that manufacturing systems of practical sizes can be effectively and rapidly reconfigured to accommodate production changes.
What problem does this paper attempt to address?