Methods Of Improving Rout Ability In Timing-Driven Placement

Wt Hou,Xl Hong,Wm Wu,Yc Cai
DOI: https://doi.org/10.1109/ICASIC.2001.982510
2001-01-01
Abstract:How to decrease the maximum delay and how to improve the rout ability are two important goals in the placement algorithm. But there are some conflicts between the two goals. In this paper, we provide two heuristic methods to reach the two goals during the global placement stage. In both of the two methods, the algorithms include two steps. We try to decrease the maximum delay in the first step, then in the next step we adjust the cells' position in the local area to improve the rout ability. We have tested our two algorithms in two real circuits. And the results show that the maximum delay and the number of the critical paths do not increase a lot, and the rout ability improved.
What problem does this paper attempt to address?